Astm d882 pdf free download

Astm d882 pdf free download forward this error screen to 74. ACM Series Aluminum Composite Panel Cladding System. Composite wall panel dry joint, p

Astm d882 pdf free download forward this error screen to 74. ACM Series Aluminum Composite Panel Cladding System.

Composite wall panel dry joint, pressure-equalized rainscreen system. Accessories including sub girts, aluminum panel splines, aluminum panel bases, head flashings, clips, shims, fasteners, and aluminum trim prefinished to match aluminum wall panels. Reference Standards: Current edition at date of Bid. 1 – Standard Test Method for Water Penetration of Windows, Curtain Walls and Doors Using Dynamic Pressure. AAMA 508-07 – Voluntary Test Method and Specifications for Pressure Equalized Rain Screen Wall Cladding Systems.

ASTM B 209 – Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate. ASTM D 294 – Method of Tumbler Test for Coke. ASTM D 659 – Method of Evaluating Degree of Chalking of Exterior Paints. ASTM D 882 – Standard Test Method for Tensile Properties of Thin Plastic Sheeting. ASTM D 968 – Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive.

ASTM D 2244 – Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates. ASTM D 3352 – Standard Test Method for Strontium Ion in Brackish Water, Seawater, and Brines. ASTM E 84 – Standard Test Method for Surface Burning Characteristics of Building Materials. ASTM E 283 – Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen.

ASTM E 330 – Standard Test Method for Structural Performance of Exterior Windows, Doors, Skylights and Curtain Walls by Uniform Static Air Pressure Difference. ASTM E 331 – Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference. Coordination: Conform to provisions of Section 01 31 13 for coordination with work of other Sections. Section 07 25 00 for application of weather resistive barrier over exterior sheathing substrate specified. Section 06 16 43 following installation of sub girt system as required to seal and make a continuous air barrier. Preconstruction Meetings: Conform to provisions of Section 01 31 19.